Video duration: 512 seconds
Global video hits: 178
The final days of construction, things are wrapping up on this job...warning shameless plug for ZT
I apologize for the last minute, I should have watched it all before rendering
Video duration: 523 seconds
Global video hits: 290
The drilling rig moved on, but it was a long haul and I couldn't stay for the actual rig up that happenend a day later, but did get to see many loads arrive onsite.
I love this sh*t, there is nothing cooler than oilfield trucks and the drilling rigs they haul around, as Alienincognito of Precision rig #150 would say: "Riggin is the life!"
Video duration: 487 seconds
Global video hits: 519
Day 2 and the dirt movers have arrived, it is a bid job to pad with dirt fill, so they are pre-leveling as best they can in order to haul less material. A bonus feature and quite unexpected dog stars in this vid for Zoetoots as he knew you would be watching
Video duration: 443 seconds
Global video hits: 382
We had to install some "Weeping tile" log drains to make sure the water didn't come up and make a mess, hopefully the logs give just enough space to let the water seep from under the pad.
Started hauling dirt yesterday, 4 dump trucks an the 324D loading out. Switched out the D6H for the D6R 6-way, the operator is happy, it has been getting chilly, -2c in the morning.
Video duration: 534 seconds
Global video hits: 596
No music, no complicated transitions, just a video of the logging equipment showing up on site and starting to log off the borrow pit that will be used to provide dirt for the drilling site